Performing technical and consulting services of the second stage (detail design and preparation of executive plans) for architectural and structural works, mechanical and electrical installations, road infrastructure, road pavement, rail infrastructure, rail pavement of Eastern Parking Depot, Line 7 of Tehran Metro
Studies of the second phase of the depot and the eastern parking lot of Haft Metro Line
Name of Employer: Specialized holding of road and urban development of Hara Institute
type of project: Studies of the second phase of the depot and the eastern parking lot of Haft Metro Line
project site: Tehran
Further Details: