The measures taken to perform technical services and design the first and second stages in process, safety, construction, architecture and landscaping projects and other technical services as well as the third stage services of high supervision and workshop services
Project introduction
This project includes all the required activities in South Pars Gas Complexes, including studies and design, as well as high-level and workshop supervisions. Below is a list of the employer’s notifications so far:
- Contract period: 24 months
- Work extension and extension: 24 months
- Start date: 09/1396
- Performing high supervision and workshop services of the administrative building of the third refinery
- Request for preparation of parking space for heavy machinery
- Investigating the damages caused by the cracks created in the administrative building of the seventh refinery and building retrofitting plan
- Designing the construction of a roundabout on the highway of Bushehr Bandar Abbas –
- Investigating the feasibility of replacing fluorescent lights in the industrial site of the refinery and the central office of the headquarters
- Management of chemical consumption in South Pars gas complex
The design of the head office and the area of the office building (covered bus parking, access road to the parking + stationevacuation of passengers) - Chemical warehouse FIREFIGHTING system
- Revision of the design of the structure of the repair shed for the crane load of the 1st refinery
- Designing the main gate of the entrance of the South Pars gas complex and the refineries of the complex
- Coordination and adjustment of protective relays of the sixth refinery