- Actions taken to provide consulting services to advance corrective measures required for Zob Khatunabad Smelter Reform Project with the purpose of revision, including project management services, preliminary design studies, design and engineering, equipment supply engineering, monitoring and engineering on the site.
- Project introduction
Providing consulting services for the improvement of Zob Khatunabad Smelting Project with the purpose of revision, including project management services, preliminary design studies, design and engineering, equipment supply engineering, supervision and engineering on site, short-term engineering services and supply of required personnel. According to the defined headings according to the terms and conditions contained in the contract and its annexes. - Date of notification of the contract: 08/1390
During these years, more than 70 sub-projects have been carried out for the reform unit, some of the projects carried out in this contract are as follows:
Design and supervision of restaurant development plan
Designing and supervising the implementation of the amphitheater cultural and artistic building of the center of mosque documents – – – –
HSE building design and supervision
Perimeter retaining wall
Bypass fan FF unit 78
Volvo design unit 206
Amphitheater interior architecture
Design of dust collection system
Cathodic protection design
Repair workshop design
Design and selection of diesel types of 350 / 3000 / 250 KW diesels
Design and supervision of Damin water reservoirs of unit 78
Dilution fan design unit 06
Design of fire alarm and extinguishing system
Design and supervision of fan 407
Designing green space, parking lot, road, warehouse, lighting system
In addition, Khatunabad copper complex includes Midok mining, Midok concentrator, Midok leaching, smelter, refinery, which these consulting engineers have provided consulting and monitoring services in various sectors.
Design and supervision of Khatunabad smelting project
Name of Employer: National Iranian Copper Industries Company
type of project: Providing consulting services to advance the corrective measures required for the Zob Khatunabad smelter reform project with the aim of revision, including project management services, preliminary design studies, design and engineering, equipment supply engineering, monitoring and engineering at the site.
project site: Kerman
Project area: 14580
Further Details: