Preparation of the plan for the development of light water facilities and sanitary waste water collection and treatment system for the casting and forging factory of heavy parts of Efrain.
Preparation of the explanatory plan for the required spaces of the cultural building plan for expansion
Engineering control services and performing engineering services of medium plans required in the management of engineering affairs of Petrochemical Special Economic Zone (Mahshahr)
Preparing a plan for the improvement of the area adjacent to the remaining land from the Tehran-Tabriz railway
Preparation of comprehensive plan and design and supervision of two new faculties of Amir Kabir University
Preparation of the technical and economic explanatory report of the distribution transformer production plan in the Kurdistan Power Development Company