Preparation of the technical and economic explanatory report of the distribution transformer production plan in the Kurdistan Power Development Company
Preparation of comprehensive plan and design and supervision of two new faculties of Amir Kabir University
Preparing a plan for the improvement of the area adjacent to the remaining land from the Tehran-Tabriz railway
Preparation of maps of the current situation and a plan to strengthen the three halls of the production line of the rolling company and the production of steel parts
Technology engineering and general engineering services and monitoring the implementation of the seamless pipe production plan
Technology engineering and general engineering services and monitoring the implementation of the seamless pipe production plan
Engineering and consulting services for the location of the construction site of the seamless pipe factory